The Heyward House is located in Bluffton, South Carolina. It was built in 1841 in the early Carolina Farmhouse style brought to North America by planters from the West Indies. The north parlor and the bedroom above, were the first parts of the house built by John J. Cole and his slaves in the early 1840s as a summer home for his wife Carolina Corley and their children. John J. Coles plantation was approximately 10 miles from downtown Bluffton. His father-in-law owned Moreland Plantation, located on present day Palmetto Bluff. By 1860, Cole had more than doubled the size of the house and his family, at which time the front and side windows in the front rooms were replaced with larger windows. The original parlor windows were reused in the dining room and back bedroom. The interior is clad with wide heart pine boards. The last remaining slave cabin in Bluffton still resides on the property. The original unattached summer kitchen was moved to the rear of the property when a large square attached kitchen was added to the main house in the 1930s. Beetles damaged the original summer kitchen and the structure was reconstructed with original and new wood. Following the Civil War, Mr. Wikipedia


Are you located near the in Hayward House Museum and Welcome Center and looking for the Builders Palmetto Bluff in Bluffton, SC? Go to the Kendrick Construction. it's only 13 min (8.1 miles) via SC-46 E/May River Rd Fastest route now due to traffic conditions.You can just use this driving direction below:

What is the typical timeline for a custom home project?


The timeline for a custom home project can vary based on factors such as the complexity of the design, the size of the home, site conditions, permit processing, weather, and the builder's workload. However, a general estimate for a custom home project's timeline can range from 10 to 16 months, including various stages.


Design and Planning (2-6 months): This phase involves collaborating with architects and designers to create detailed plans, blueprints, and securing necessary permits. The timeline depends on design complexity and potential revisions.
Learn More Here



Pre-construction (1-2 months): Finalizing contracts, establishing the construction schedule, obtaining permits, and preparing the site for construction.


Foundation and Framing (2-4 months): Excavation, foundation pouring, and structural framing set the foundation for the home. The timeline can vary based on the home's size and complexity.


Rough-Ins (1-2 months): This stage involves installing essential systems like plumbing, electrical, and HVAC before interior finishes.


Interior Finishes (2-4 months): Flooring, cabinetry, fixtures, and other interior finishes are installed. This phase's duration depends on customization and material availability.


Final Touches (1-2 months): Adding final details, conducting quality checks, and addressing any punch-list items before completion.


Final Inspections and Closing (1-2 months): City inspections, final walkthroughs, and obtaining the certificate of occupancy conclude the project.


If you are looking for the
best custom home builder near Rose Hill, Kendrick Construction is the perfect option for you. See More Here Spend‌ ‌your‌ ‌weekend‌ ‌in Church of the Cross Bluffton


Kendrick Construction


5752 Guilford Pl Suite 201, Bluffton, SC 29910, United States


+18437579351


https://www.kendrick.us/